Skip to main content

The Hardware Trust Model · Golden Architecture

The Trust Machine
AI reads, code checks

We use AI strictly as an optical sensor, not as an oracle. Extracted pinouts, footprint dimensions and electrical ratings are checked against mathematical invariants before they enter a canonical contract or an EDA library, and what fails is flagged or held back.

Geometry Invariant

IPC-7351 Solder Fillets

Toe, heel & side equations

Package Resolution

Ordering Suffix Parser

Terminal count checked against the package

Toolchain Gate

KiCad CLI Preflight

Headless file-load checks

Hallucination Policy

Ambiguity Gets Flagged

Flagged for review on ambiguity

The 5 Checked Stages

From a component PDF to reviewable CAD in five checked stages

The model proposes candidate facts; deterministic TypeScript code checks them and decides what is delivered and what is flagged for review.

Stage 01Optical Ingestion

Spatial Sensor Ingestion

AI Sensor

Google's Gemini reads the PDF pages and reports the tables and values it finds, with their pages. The PDF's own text layer and the document map help pick which pages to read.

Stage 02Terminal Invariant

Target Package Resolution

Part Suffix Invariant

Family datasheets often cover several packages in one table; ST's STM32H743 datasheet covers eight. The engine decodes the ordering suffix (e.g. STM32H743ZIT6 → LQFP144) to set the terminal count a candidate pin table must match: 144 here. A table with a different count is rejected.

Stage 03Semantic Integrity

Semantic Pin Isolation

Class Invariant

Physical pin classes (POWER, GROUND, BIDIRECTIONAL, RESET, CLOCK, ANALOG, NC) are kept apart from multiplexed software peripheral modes (SPI, UART, ADC, FMC).

Stage 04Geometric Closure

IPC-7351 Geometric Solvers

Mathematical Brain

When the datasheet prints no land pattern, the stated lead widths, foot lengths and spans, with their tolerances, go through simplified IPC-7351B fillet equations. The result is labeled calculated and flagged for review.

Stage 05kicad-cli Load Check

EDA CLI Preflight Gate

File-Load Check

Generated .kicad_mod and .kicad_sym files are loaded and re-saved by local KiCad CLI tools (sym upgrade / fp upgrade) to confirm they parse cleanly in current KiCad format. Our own deterministic engine then checks pad gaps, courtyard closure, and copper overlap before delivery.

The Invariants

The rules the Trust Machine checks results against

In software, a bug causes a crash. In hardware, an inverted pin or a wrong footprint pitch can destroy a part. These are the rules the code applies.

IPC-7351 Solder Fillet Arithmetic

Zmax = spanMin + 2*JT + rss(Cspan, F, P)

Computes the outer land extent (Zmax), the inner land extent (Gmin) and the land width (Xmax) from the toe, heel and side fillet goals (JT, JH, JS), the stated tolerances, and fabrication (F) and placement (P) tolerances. Component dimension tolerances must close geometrically before CAD export.

  • Toe fillet JT sets the solder margin beyond the lead tip
  • Heel fillet JH sets the joint at the heel, toward the body
  • Side fillet JS widens the land beyond the lead; at fine pitch the width is clamped to keep a 0.1 mm copper gap, and the clamp is reported

Physical Class vs. Peripheral Mux Separation

PIN_CLASS in [POWER, GROUND, BIDIRECTIONAL, INPUT, OUTPUT, ANALOG, CLOCK, RESET, CONFIG, NC, RESERVED, UNKNOWN]

The physical pin class is its own field. Multiplexed peripheral capabilities go into separate structured_functions and interface_groups arrays. A special pin such as BOOT0 with a high-voltage VPP function is tagged for its bootstrap and programming role and is not listed as a normal power domain.

  • Physical pin class is a separate field from the alternate functions
  • Multiplexed AF modes (e.g. USART_TX, SPI_MOSI) map to structured interface tags
  • Bootstrap and programming pins carry critical tags, not a power-domain entry

Package Courtyard & Keep-Out Clearance

Courtyard = outer land extent + 2 × courtyard excess

The courtyard is drawn around the outer land extent plus the density level's courtyard excess, so neighboring parts keep their placement clearance.

  • Courtyard excess by IPC-7351 density level: 0.5, 0.25 or 0.1 mm
  • The outer land extent already includes the stated tolerances
  • Pin 1 orientation follows the drawing; on a no-lead package whose drawing does not show it, the bundle says it was assumed

Absolute Maximum & Thermal Envelopes

TJ = TA + (PD × θJA) ≤ TJ_MAX

Operating limits, absolute maximum ratings and thermal values are extracted as machine-readable constraints, with their page where the extraction recorded one. The Workbench's thermal rule applies this junction-temperature formula to a design you build.

  • Absolute maximum ratings kept apart from recommended operating conditions
  • Junction temperature limit (TJ_MAX) and θJA kept with their pages where recorded
  • In the Unified Component Model, conflicting values are kept side by side and marked, not resolved silently

Runtime Decision Taxonomy

Three verdicts, decided by a fail-closed gate

Every KiCad run ends in exactly one bundle_status. The readiness gate can only refuse: a passing kicad-cli load or a high score never upgrades a failed check.

bundle_statusVerdictWhat must be trueWhat you receive
completedREADYThe fail-closed readiness gate passed: pads reconcile with the resolved package, symbol, footprint and package agree on the terminal count, and the dimensions belong to the selected variant.Both files delivered as ready, with the verdict and its evidence pages.
needs_reviewNEEDS REVIEWA file was produced but a check did not pass, kicad-cli could not load it, or it came from the KiCad library or IPC-7351B math instead of this datasheet.Delivered with the exact reasons and marked for engineer review before fabrication.
cannot_extractCANNOT EXTRACTNo usable symbol or footprint: the package could not be resolved, or its dimensions were missing or contradictory.Nothing is passed off as a footprint; the run states what was missing and where it looked.
Headless KiCad CLI preflight· illustrative sample
# Illustrative run for an LQFP-144 part. The commands are the exact ones the
# validator runs; the verdict fields are the pipeline's real final_readiness keys.

$ kicad-cli sym upgrade STM32H743ZIT6.kicad_sym --output STM32H743ZIT6.validated.kicad_sym --force
$ kicad-cli fp upgrade DatasheetVend.pretty --output DatasheetVend.validated.pretty --force
  -> file-load check: both files parse and re-save in the current KiCad format
     (a format check - kicad-cli runs no DRC or ERC here)

# DatasheetVend's own deterministic checks (not kicad-cli):
final_readiness:
  syntax_valid                  true
  native_kicad_valid            true   (the kicad-cli load above)
  placement_structurally_valid  true   (pads reconcile with the resolved package's pad map)
  terminal_census_consistent    true   (symbol, footprint and package agree: 144 terminals)
  package_identity_consistent   true   (dimensions belong to LQFP144, the resolved variant)
  dimension_evidence_coherent   true
  physical_truth_approved       true   (false if ANY check above fails)

bundle_status: completed        # anything short of this ships as needs_review

Audit Contract Delivery

Each extraction ships with its audit record

A run delivers audit JSON beside its results: the ordering-suffix resolution, source pages and warnings, and, for a KiCad run, the readiness verdict with its reasons and the kicad-cli load check.

Lineage: Source PDF pages attached to pins and limits, wherever the extraction recorded them.

Classified Severity Warnings: Explicit flags for strapping pins, conditional footnotes, and bootstrap voltages.

Machine-Ingestible: JSON that scripts, CI netlist audits and AI agents can read.

kicad_bundle.json, real RP2040 run, abridgedNEEDS REVIEW
{
  "schema_version": "kicad_bundle_v1",
  "bundle_status": "needs_review",
  "review_required": true,
  "generation_meta": {
    "target_package": {
      "target_part": "RP2040",
      "package_variant": "QFN56",
      "expected_pin_count": 56,
      "source": "part_number_suffix",
      "confidence_score": 0.97
    }
  },
  "final_readiness": {
    "syntax_valid": true,
    "native_kicad_valid": true,
    "terminal_census_consistent": true,
    "package_identity_consistent": true,
    "blocking_reasons": [],
    "review_reasons": [
      { "code": "CLOSURE_REVIEW_REQUIRED",
        "detail": "The footprint closure gate requires review before production use." }
    ]
  }
}

Audit a component PDF with the Trust Machine

Create an account for five free passes, up to two modules each, on a PDF up to 25 MB. Check any value against the page it names.

Cookies. Strictly necessary cookies keep you signed in and remember this choice. Optional analytics (Google, Microsoft, PostHog) show us how the site is used. Cookie details